hyde-park-square-london-mosaic-project

This original un-glazed ceramic tessellated entrance was found to be beyond repair as a result of a failed screed causing moisture ingress to the basement below. The mosaic was accurately templated, reconstructed in our workshop using the traditional ‘reverse method’ before installing on site. The Main Contractor was responsible for the structural, new screed and tanking works. During the project full uninterrupted access was made available to the residents of the Mansion Block.

hyde-park-square-london-mosaic-project-before-1
hyde-park-square-london-mosaic-project-before-tile-match
hyde-park-square-london-mosaic-project-before-close-up
hyde-park-square-london-mosaic-project-complete-crop